# Interior Contracting Companies in Dubai: What a Contractor Actually Does
An interior contracting company in Dubai is the licensed builder that turns approved drawings into a finished space: procurement, site works, MEP, supervision, authority approvals and handover. That is a different role from a designer, who draws, and a decorator, who styles. As a market guide, interior contracting in Dubai runs roughly AED 150–500+/sqft depending on finish, and a full villa or office build runs six to twelve months from signature to handover.
What interior contracting means, and how it differs from design and fit-out
Most owners use "contractor", "designer", "fit-out company" and "decorator" as if they were the same job. They pay for that confusion later, usually when something goes wrong on site and nobody in the WhatsApp group is contractually responsible for fixing it.
The contractor is the party that holds the build contract, carries the labour, buys the materials, runs the trades and hands you a finished space signed off by the authorities. A designer produces the drawings, the 3D visuals and the material schedule. A decorator handles the soft, reversible layer: furniture, curtains, styling. "Fit-out" is not a separate species — it is the scope a contractor delivers inside an existing shell, as opposed to structural or base-build work.
| Role | What they own | What they sign | Who they answer to |
|------|---------------|----------------|--------------------|
| Interior designer | Concept, drawings, 3D, material and finish schedules | A design agreement, usually fee-based | You, on look and specification |
| Interior contractor | Procurement, labour, site works, MEP, approvals, handover | A build contract with a fixed scope and price | You and the authority, on execution and compliance |
| Fit-out company | The same as a contractor, scoped to interior works inside a shell | A fit-out contract | You, the developer and the community |
| Decorator / stylist | Loose furniture, textiles, art, styling | A supply or styling order | You, on taste |
The practical test is simple. If a wall is in the wrong place or the waterproofing fails, that is the contractor's liability, in writing. If the room looks cold under the chosen lighting temperature, that is a design decision. When one firm holds both roles, which is how we work, you still want the two responsibilities separated in the paperwork so a design change and a build defect are never argued as the same thing.
If you are still at the stage of picking a firm, the licensing and red-flag checks in our buyer's guide to choosing a company come before any of the contract detail below.

What contracting costs per square foot in Dubai
The honest answer is a band, not a figure, because a contractor prices execution and execution scales with finish level and building. As a market guide to plan around, interior contracting in Dubai runs roughly AED 150–500+/sqft for the build works, before furniture and loose décor.
- Basic: repaint, flooring swap, minor joinery, light electrical. No wet works, no layout change. Towards the lower end of that band.
- Standard: new bathroom or kitchen, partial MEP reroute, false ceilings, mid-range finishes. Mid-band.
- Premium: full strip-out, layout changes, bespoke joinery, stone, imported fittings, smart systems. At or above the top of the band.
Those are market ranges, not a DOMECO price list. The number on your contract depends on the drawings, the building and the finish, which is why a real quote is priced against a bill of quantities and not guessed over the phone.
The bigger cost decision is the contract structure. A fixed-price (lump-sum) contract gives you one number tied to a defined scope: the risk of overruns sits with the contractor, and the discipline of it forces a proper bill of quantities up front. A cost-plus contract bills actual cost plus an agreed margin, which suits a moving scope but hands you the overrun risk and requires you to audit invoices. For a defined villa or office, fixed-price protects the owner. Cost-plus makes sense only when the scope genuinely cannot be pinned down before you start, and even then you want a cap.
Two line items owners forget until the invoice. VAT is 5% on the contract, and any serious quote states whether the figure is inclusive or exclusive. And a lowball bid that beats the market band by 30% is not a bargain, it is a deposit on future variations. The gap between a cheap quote and an honest one is almost never craftsmanship, it is the compliance and MEP scope the cheap one left out. How we fix the number so there are no top-ups after start is set out in our services.
DED licence and authority approvals: how to check a contractor is real
Before scope, before price, check that the company can legally do the work. In Dubai an interior contractor needs a valid DED (Department of Economy and Tourism) trade licence with the right activity on it, and the relevant projects need approval from the governing authority.
Ask for the trade licence number and verify it yourself. A licensed contractor carries an activity such as building contracting, interior decoration or fit-out on the licence, an active status, and a current expiry date. If a firm hesitates to send the number, that is your answer. Free-zone and mainland licences differ, and a mainland DED contractor can generally work across most communities, while some free zones require a firm registered inside their own jurisdiction.
Approvals depend on where the property sits. Most freehold communities and towers sit under Dubai Municipality or the relevant developer's process; districts like DIFC or d3 fall under DDA or Trakhees-style authorities with their own submission routes. On top of that, the developer or community management (Emaar, Nakheel, DMCC and the rest) runs its own NOC, insurance requirement and approved-contractor list. Any change to load, new AC or a moved distribution board needs DEWA sign-off, and unapproved electrical work fails inspection and blocks your handover.
Budget six to ten weeks for the approval layer on a normal fit-out, longer if structural drawings need a consultant's stamp. None of this shows up in a WhatsApp estimate, and it is the first thing a management company asks about before issuing a permit. A checklist worth keeping before you sign anything:
- Trade licence number, verified in the DED register, with fit-out or contracting activity.
- Proof the firm is on your building's approved-contractor list, or can get on it.
- Third-party and workmen's insurance, named for your project.
- A named person responsible for authority submissions, not "we'll sort it".

The process and timeline: what six to twelve months actually looks like
A full villa or office build in Dubai runs six to twelve months from signature to handover, and most of the surprises live in the front and back thirds, not the middle. Owners fixate on construction weeks and underweight approvals and snagging, which is exactly backwards.
The sequence a contractor runs, in order:
- 1. Drawings and BOQ: the contractor prices against a fixed set of drawings and a bill of quantities. No approved drawings, no honest price.
- 2. Approvals and NOCs: six to ten weeks, submitted to Dubai Municipality or DDA plus the developer. This runs in parallel with procurement where possible.
- 3. Procurement and long-lead items: stone, imported joinery, specialist glass and bespoke kitchens can carry six to ten week lead times. This is the single most common cause of a slipped date.
- 4. Demolition and first fix: strip-out, then the MEP first fix (electrical conduit, plumbing rough-in, HVAC ducting inside walls and ceilings).
- 5. Second fix and finishes: waterproofing, tiling, false ceilings, joinery installation, painting, fittings.
- 6. Testing, commissioning and snagging: MEP tested, defects listed, defects closed, then handover.
Two things stretch a Dubai schedule more than the work itself. Buildings restrict working hours, so a tower that only allows noisy works from 09:00 to 17:00 on weekdays adds weeks a villa would not. And summer matters: waterproofing and screed cure differently in July humidity, and a contractor who rushes wet works to hit a date is buying you a leak. Anyone promising a full villa build in eight weeks is quoting a different scope or planning to ask for more money later. The kind of work these timelines produce is in the completed projects.
Fixed-price versus cost-plus, milestones and retention
The contract is where an interior contracting relationship is won or lost, and two clauses do most of the protecting: the payment schedule and the retention.
On a fixed-price contract, tie payments to milestones, never to a calendar. A sane schedule looks like a mobilisation payment on signature, then stage payments released against verified completion: approvals secured, first fix done, second fix done, snag-free handover. Paying by date rewards a contractor for showing up; paying by milestone rewards one for finishing. If a firm wants 50% up front against nothing verifiable, walk.
Retention is the clause owners skip and regret. Hold back a percentage of each payment, commonly around 5–10%, released only after handover and the defects window closes. That retained sum is your only real leverage once the bulk of the money is paid, and it is the difference between a contractor who returns to fix a defect and one who stops answering. A serious builder expects retention and prices for it, so its absence in a quote is a signal, not a saving.
Two more things belong in writing. A penalty for delay, a defined amount for every day past the agreed deadline, which we carry in our contracts. And a fixed estimate with no top-ups after start, so a variation is a documented decision you approve, not a surprise on the final invoice. How that scope, price and timeline get locked is described in our services.
Snagging, defects and warranty: who owns what after handover
Handover is not the end of the contractor's responsibility, and the paperwork that governs the months after handover matters as much as the build.
Snagging is the joint inspection where you and the contractor walk the finished space and list every defect: a door that binds, a tile lippage, a paint blemish, a socket that does not sit flush. The contractor closes the list before final payment. Give yourself a proper snagging window, commonly around 30 days, and do not release the final tranche until the list is genuinely closed rather than "closed" over WhatsApp.
After that sits the warranty. Under the UAE Civil Code, contractors and consultants carry a decennial (10-year) liability for structural integrity — meaning a defect that threatens the building's stability is their responsibility for a decade. Fit-out and non-structural works are a different matter: the MEP systems, joinery, waterproofing and general finishes a contractor installs carry a defects liability period of around one year, the standard DLP stated in most fit-out contracts. In our case, works carry a one-year guarantee on the fit-out; the structural decennial liability the law imposes sits on top for anyone touching structure.
So the map is clean: snag list closed inside the 30-day window, MEP and general fit-out workmanship covered for the defects year, structure covered for ten. If a contractor's paperwork is silent on any of these, you have no written recourse once the final payment clears. When something does go wrong, you want a firm you can reach; ours sits on WhatsApp and email.
One boundary worth naming: what DOMECO does as the contractor
There is a specific line between drawing a space and being liable for how it gets built, and it is the line we sit on.
DOMECO holds the build contract. That means we own procurement, our own crew rather than a subcontractor hired for the day, the MEP works, the authority approvals and the handover. We fix the estimate in the contract with no top-ups after the start, we carry a penalty for every day past the agreed deadline, and works carry a one-year guarantee. Whether a design comes from our own studio or from a designer you already hired, our responsibility is execution and compliance, in writing, with our licence and insurance behind it.
That is the difference between a contractor and a firm that only produces drawings: when the wall is wrong, the waterproofing fails or the inspection is due, there is a licensed party contractually on the hook to fix it. If you want a rough figure for your own villa or office, our team gives a priced quote against your actual scope once drawings are in.
FAQ
How much do interior contracting companies in Dubai charge per square foot?
As a market guide, interior contracting in Dubai runs roughly AED 150–500+/sqft for the build works, before furniture and décor, with basic refurbishment at the low end and full premium strip-outs at the top. VAT of 5% applies on top, and the exact rate depends on the building, scope and finish, so a firm number needs drawings rather than a phone description.
What is the difference between a contractor, a designer and a decorator?
The designer draws the space and specifies finishes, the contractor builds it and is contractually liable for execution and compliance, and the decorator handles loose furniture and styling. If a wall is in the wrong place that is the contractor's problem in writing; if the room looks cold that is a design decision. One firm can hold more than one role, but the responsibilities should stay separated in the paperwork.
Do I need a DED licence to hire a contractor, or does the contractor need one?
You do not need a licence; the contractor does. Ask for the DED trade licence number and verify it yourself, confirming the licence is active, unexpired and carries a fit-out or contracting activity. A firm that hesitates to share the number is a firm to skip.
What should I ask a contractor before signing?
Ask for the verified DED licence, proof they are on your building's approved-contractor list, third-party and workmen's insurance, and a fixed price against a bill of quantities. Then confirm the payment schedule is tied to milestones, that retention is held back to handover, and that the contract names a delay penalty and a defects window. Vague answers on any of these are the answer.
How long does an interior contracting project take in Dubai?
A full villa or office typically runs six to twelve months from signature to handover. Approvals take six to ten weeks, long-lead materials add six to ten more, and restricted building working hours stretch the schedule further. Construction is rarely the part that slips; approvals and procurement are.
What is snagging and how long does it take?
Snagging is the joint inspection where you and the contractor list every defect in the finished space, from binding doors to tile lippage, and the contractor closes the list before you release final payment. Give it a proper window, commonly around 30 days, and do not sign off until the list is genuinely closed.
Is the contractor responsible for MEP and structural problems after handover?
Yes, for different lengths of time. MEP systems and general fit-out workmanship typically carry a defects liability period of around one year, the standard DLP in most fit-out contracts. Structural integrity carries a decennial (10-year) liability under the UAE Civil Code, so a defect threatening the building's stability stays the responsibility of whoever built the structure for a decade.
How do change orders work on a fixed-price contract?
A change order is a documented variation: you request a change, the contractor prices it against the original scope, and you approve the cost and any timeline impact before work proceeds. On a genuine fixed-price contract nothing changes the number without a signed change order, which is what stops "extras" appearing on the final invoice. Insist that every variation is written and priced, not agreed verbally on site.